Posts tagged "vs traffic"
These are completed using Automatic Traffic Counters, often referred to as an ATC. The usual appearance on-site is a pair of rubber tubes across the road, connected to the ATC machine at one end, on the side of the road. They are an extremely cost-effective method of obtaining a wide variety of data such as classified traffic flow, giving a full breakdown of every type of vehicle that has passed over the tubes, as well as their speeds – all by direction.
A host of other data is also available from ATCs (such as vehicle headway, etc.) but the typical requirements are for flow and speed. A common application is for site access appraisals for determining the correct visibility to be achieved, as well as providing key traffic data for cordon or census studies (usually requested by the highway authority).
For development planning applications, access and visibility can be an important issue. There are set standards for visibility splay based on the prevailing speed limit of the road. In some cases, those standards are appropriate, but in others, they can be onerous and impractical for some sites. By completing an ATC data collection exercise followed by approved numerical analysis we can help you determine the correct visibility for your site.
#TransportAssessments #TrafficAssessments #ConstructionProjects #VSTraffic #ParkingSurveys #AutomaticTrafficCounts #TrafficSurveys
Smart motorways are to be investigated as part of a wide-ranging review into UK motorway safety.
They were were first introduced in England in 2014 and are built and managed by Highways England.
They aim to keep traffic moving by converting the existing hard shoulder into an "active" fourth lane and controlling speed limits.
There are also emergency pull-ins, or refuges, in case a vehicle needs to stop, although campaigners say these are spread too far apart.
An all-party parliamentary group, chaired by former transport minister Sir Mike Penning, will look at whether smart motorways are more dangerous for drivers than standard motorways.
The group will also look at measures to keep vehicle recovery operators safe across UK roads.
Sir Mike told Sky News: "Why are so many people dying when they come to your rescue on our motorways?"If six police officers were killed every year there would be uproar, yet we have six rescue workers being killed every year."
Vehicle recovery operator Steve Godbold was killed in 2017 whilst attending to a breakdown on the hard shoulder of the M25.
The father-of-four's partner, Sam Cockerill, told Sky News: "Steve was killed when there was a hard shoulder to operate in. A smart motorway doesn't even have a hard shoulder so it's automatically more dangerous.
"Drivers needs to be made more aware about how to be safe, about slowing down and changing lanes when they see a recovery vehicle in action and rescue recovery vehicles should be allowed to have rear red-flashing lights like other emergency services."
Larry Axten has been a recovery vehicle operator for nine years. He says working on smart motorways makes him feel vulnerable.
Mr Axten said: "If people don't actually breakdown in one of the actual slips where they can pull in, it then can cause a major problem because technically we are then in a live lane.
"You've still got traffic coming behind, so the car's in danger itself and unless [the lane has] been shut off you're in danger as well."
Highways England told Sky News: "Smart motorways are good for drivers... and evidence proves they are as safe as traditional motorways, which are already among the safest roads in the world."
But in its own study, Highways England found that driver behaviour might be making smart motorways even more dangerous than they should be.
Electronic motorway signs display a red cross above a lane that needs to close because of an obstruction.
But Highways England own study found that one in five drivers ignored the red cross which has led to major vehicle-recovery firms calling for this urgent inquiry into smart motorways safety.
Richard Goddard, managing director of Automania Vehicle Recovery, said: "When I send my guys out, myself and their families expect them to come home.
"What we're asking for is nothing economic, it's common sense; better safety, better visibility, better protection for ourselves and the people we're going out to serve."
#TransportAssessments #TrafficAssessments #ConstructionProjects #VSTraffic #ParkingSurveys #AutomaticTrafficCounts #TrafficSurveys
What are Travel Plans, Transport Assessments and Statements?
Travel Plans, Transport Assessments and Statements are all ways of assessing and mitigating the negative transport impacts of development in order to promote sustainable development. They are required for all developments which generate significant amounts of movements.
Paragraph: 002 Reference ID: 42-002-20140306
Revision date: 06 03 2014
What are Travel Plans?
Travel Plans are long-term management strategies for integrating proposals for sustainable travel into the planning process. They are based on evidence of the anticipated transport impacts of development and set measures to promote and encourage sustainable travel (such as promoting walking and cycling). They should not, however, be used as an excuse for unfairly penalising drivers and cutting provision for cars in a way that is unsustainable and could have negative impacts on the surrounding streets.
Travel Plans should where possible, be considered in parallel to development proposals and readily integrated into the design and occupation of the new site rather than retrofitted after occupation.
Where there may be more effective or sustainable outcomes, and in order to mitigate the impact of the proposed development, consideration may be given to travel planning over a wider area.
Related policy:
Paragraph: 003 Reference ID: 42-003-20140306
Revision date: 06 03 2014
What are Transport Assessments and Statements?
Transport Assessments and Statements are ways of assessing the potential transport impacts of developments (and they may propose mitigation measures to promote sustainable development. Where that mitigation relates to matters that can be addressed by management measures, the mitigation may inform the preparation of Travel Plans).
Transport Assessments are thorough assessments of the transport implications of development, and Transport Statements are a ‘lighter-touch’ evaluation to be used where this would be more proportionate to the potential impact of the development (ie in the case of developments with anticipated limited transport impacts).
Where the transport impacts of development are not significant, it may be that no Transport Assessment or Statement or Travel Plan is required. Local planning authorities, developers, relevant transport authorities, and neighbourhood planning organisations should agree what evaluation is needed in each instance.
Paragraph: 004 Reference ID: 42-004-20140306
Revision date: 06 03 2014
How do Travel Plans, Transport Assessments and Statements relate to each other?
The development of Travel Plans and Transport Assessments or Transport Statements should be an iterative process as each may influence the other.
The primary purpose of a Travel Plan is to identify opportunities for the effective promotion and delivery of sustainable transport initiatives eg walking, cycling, public transport and tele-commuting, in connection with both proposed and existing developments and through this to thereby reduce the demand for travel by less sustainable modes. As noted above, though, they should not be used as way of unfairly penalising drivers.
Transport Assessments and Transport Statements primarily focus on evaluating the potential transport impacts of a development proposal. (They may consider those impacts net of any reductions likely to arise from the implementation of a Travel Plan, though producing a Travel Plan is not always required.) The Transport Assessment or Transport Statement may propose mitigation measures where these are necessary to avoid unacceptable or “severe” impacts. Travel Plans can play an effective role in taking forward those mitigation measures which relate to on-going occupation and operation of the development.
Transport Assessments and Statements can be used to establish whether the residual transport impacts of a proposed development are likely to be “severe”, which may be a reason for refusal, in accordance with the National Planning Policy Framework.
Paragraph: 005 Reference ID: 42-005-20140306
Revision date: 06 03 2014
Why are Travel Plans, Transport Assessments and Statements important?
Travel Plans, Transport Assessments and Statements can positively contribute to:
- encouraging sustainable travel;
- lessening traffic generation and its detrimental impacts;
- reducing carbon emissions and climate impacts;
- creating accessible, connected, inclusive communities;
- improving health outcomes and quality of life;
- improving road safety; and
- reducing the need for new development to increase existing road capacity or provide new roads.
They support national planning policy which sets out that planning should actively manage patterns of growth in order to make the fullest possible use of public transport, walking and cycling, and focus significant development in locations which are or can be made sustainable.
Government’s policy on parking is set out in the National Planning Policy Framework. Travel Plans, Assessments and Statements can also be important tools to improve the quality of town centre parking (and where, necessary to improve the vitality of town centres, the quantity too).
Local planning authorities and developers should both consider the wider benefits of Travel Plans, Transport Assessments and Statements such as helping to promote the attractiveness of a district or site to new visitors and releasing land for development that would otherwise be taken up by required related parking.
Many military establishments are located in isolated areas and the lack of choice that military families have over the location of their service accommodation means some face transport difficulties. When considering transport issues local authorities should consider the particular requirements of any Armed Forces families in their area.
Related policies:
Paragraph: 006 Reference ID: 42-006-20140306
Revision date: 06 03 2014
What key principles should be taken into account in preparing a Travel Plan, Transport Assessment or Statement?
Travel Plans, Transport Assessments and Statements should be:
- proportionate to the size and scope of the proposed development to which they relate and build on existing information wherever possible;
- established at the earliest practicable possible stage of a development proposal;
- be tailored to particular local circumstances (other locally-determined factors and information beyond those which are set out in this guidance may need to be considered in these studies provided there is robust evidence for doing so locally);
- be brought forward through collaborative ongoing working between the local planning authority/transport authority, transport operators, rail network operators, Highways Agency where there may be implications for the strategic road network and other relevant bodies. Engaging communities and local businesses in Travel Plans, Transport Assessments and Statements can be beneficial in positively supporting higher levels of walking and cycling (which in turn can encourage greater social inclusion, community cohesion and healthier communities).
In order to make these documents as useful and accessible as possible any information or assumptions should be set out in a clear and publicly accessible form:
- the timeframes over which they are conducted or operate should be appropriate in relation to the nature of developments to which they relate (and planned changed to transport infrastructure and management in the area);
- local planning authorities should advise qualifying bodies for the purposes of neighbourhood planning on whether Travel Plans, Transport Assessments and Statements should be prepared, and the benefits of doing so, as part of the duty to support.
Local planning authorities may wish to consult the relevant bodies on planning applications likely to affect transport infrastructure, such as rail network operators where a development is likely to impact on the operation of level crossings.
Paragraph: 007 Reference ID: 42-007-20140306
Revision date: 06 03 2014
Can Travel Plans, Transport Assessments or Transport Statements be used to justify higher parking charges or other constraints on car users?
While Travel Plans are intended to promote the most sustainable forms of transport, such as active travel, they should not be used to justify penalising motorists – for instance through higher parking charges, tougher enforcement or reduced parking provision (which can simply lead to more on street parking). Nor should they be used to justify aggressive traffic calming measures, such as speed humps.
Maximum parking standards can lead to poor quality development and congested streets, local planning authorities should seek to ensure parking provision is appropriate to the needs of the development and not reduced below a level that could be considered reasonable.
Travel Plans, Transport Assessments and Statements should reflect the important role that appropriate parking facilities can play in rejuvenating local shops, high streets and town centres.
Paragraph: 008 Reference ID: 42-008-20140306
Revision date: 06 03 2014
Travel Plans
When is a Travel Plan required?
Paragraph 111 of the National Planning Policy Framework sets out that all developments which generate significant amounts of transport movement should be required to provide a Travel Plan.
Local planning authorities must make a judgement as to whether a proposed development would generate significant amounts of movement on a case by case basis (ie significance may be a lower threshold where road capacity is already stretched or a higher threshold for a development which proposes no car parking in an area of high public transport accessibility).
In determining whether a Travel Plan will be needed for a proposed development the local planning authorities should take into account the following considerations:
- the Travel Plan policies (if any) of the Local Plan;
- the scale of the proposed development and its potential for additional trip generation (smaller applications with limited impacts may not need a Travel Plan);
- existing intensity of transport use and the availability of public transport;
- proximity to nearby environmental designations or sensitive areas;
- impact on other priorities/ strategies (such as promoting walking and cycling);
- the cumulative impacts of multiple developments within a particular area;
- whether there are particular types of impacts around which to focus the Travel Plan (eg minimising traffic generated at peak times); and
- relevant national policies, including the decision to abolish maximum parking standards for both residential and non-residential development.
Paragraph: 009 Reference ID: 42-009-20140306
Revision date: 06 03 2014
How should the need for and scope of a Travel Plan be established?
The anticipated need for a Travel Plan should be established early on, preferably in the pre-application stage but otherwise within the application determination process itself.
Consideration should be given at the pre-application stage to:
- the form and scope of the Travel Plan;
- the outcomes sought by the Travel Plan;
- the processes, timetables and costs potentially involved in delivering the required outcomes (including any relevant conditions and obligations);
- the scope of the information needed; and
- the proposals for the on-going management, implementation and review processes.
Paragraph: 010 Reference ID: 42-010-20140306
Revision date: 06 03 2014
What information should be included in Travel Plans?
Travel Plans should identify the specific required outcomes, targets and measures, and set out clear future monitoring and management arrangements all of which should be proportionate. They should also consider what additional measures may be required to offset unacceptable impacts if the targets should not be met.
Travel Plans should set explicit outcomes rather than just identify processes to be followed (such as encouraging active travel or supporting the use of low emission vehicles). They should address all journeys resulting from a proposed development by anyone who may need to visit or stay and they should seek to fit in with wider strategies for transport in the area.
They should evaluate and consider:
- benchmark travel data including trip generation databases;
- Information concerning the nature of the proposed development and the forecast level of trips by all modes of transport likely to be associated with the development;
- relevant information about existing travel habits in the surrounding area;
- proposals to reduce the need for travel to and from the site via all modes of transport; and
- provision of improved public transport services.
They may also include:
- parking strategy options (if appropriate – and having regard to national policy on parking standards and the need to avoid unfairly penalising motorists); and
- proposals to enhance the use of existing, new and improved public transport services and facilities for cycling and walking both by users of the development and by the wider community (including possible financial incentives).
These active measures may assist in creating new capacity within the local network that can be utilised to accommodate the residual trip demand of the site(s) under consideration.
It is often best to retain the ability to establish certain elements of the Travel Plan or review outcomes after the development has started operating so that it can be based upon the occupational and operational characteristics of the development.
Any sanctions (for example financial sanctions on breaching outcomes/processes) need to be reasonable and proportionate, with careful attention paid to the viability of the development. It may often be more appropriate to use non-financial sanctions where outcomes/processes are not adhered to (such as more active or different marketing of sustainable transport modes or additional traffic management measures). Relevant implications for planning permission must be set out clearly, including (for example) whether the Travel Plan is secured by a condition or planning obligation.
Travel Plans can only impose such requirements where these are consistent with government policy on planning obligations.
Paragraph: 011 Reference ID: 42-011-20140306
Revision date: 06 03 2014
How should Travel Plans be monitored?
Travel Plans need to set out clearly what data is to be collected, and when, establishing the baseline conditions in relation to any targets.
The length of time over which monitoring will occur and the frequency will depend on the nature and scale of the development and should be agreed as part of the Travel Plan with the developer or qualifying body for neighbourhood planning. Who has responsibility for monitoring compliance should be clear.
Monitoring requirements should only cease when there is sufficient evidence for all parties to be sure that the travel patterns of the development are in line with the objectives of the Travel Plan. This includes meeting the agreed targets over a consistent period of time. At this point the Travel Plan would become a voluntary initiative.
Paragraph: 012 Reference ID: 42-012-20140306
Revision date: 06 03 2014
Transport Assessments and Statements
When are Transport Assessment and Transport Statements required?
Paragraph 111 of the National Planning Policy Framework sets out that all developments that generate significant amounts of transport movement should be supported by a Transport Statement or Transport Assessment.
Local planning authorities must make a judgement as to whether a development proposal would generate significant amounts of movement on a case by case basis (ie significance may be a lower threshold where road capacity is already stretched or a higher threshold for a development in an area of high public transport accessibility).
In determining whether a Transport Assessment or Statement will be needed for a proposed development local planning authorities should take into account the following considerations:
- the Transport Assessment and Statement policies (if any) of the Local Plan;
- the scale of the proposed development and its potential for additional trip generation (smaller applications with limited impacts may not need a Transport Assessment or Statement);
- existing intensity of transport use and the availability of public transport;
- proximity to nearby environmental designations or sensitive areas;
- impact on other priorities/strategies (such as promoting walking and cycling);
- the cumulative impacts of multiple developments within a particular area; and
- whether there are particular types of impacts around which to focus the Transport Assessment or Statement (eg assessing traffic generated at peak times).
Paragraph: 013 Reference ID: 42-013-20140306
Revision date: 06 03 2014
How should the need for and scope of a Transport Assessment or Statement be established?
The need for, scale, scope and level of detail required of a Transport Assessment or Statement should be established as early in the development management process as possible as this may therefore positively influence the overall nature or the detailed design of the development.
Key issues to consider at the start of preparing a Transport Assessment or Statement may include:
- the planning context of the development proposal;
- appropriate study parameters (ie area, scope and duration of study);
- assessment of public transport capacity, walking/cycling capacity and road network capacity;
- road trip generation and trip distribution methodologies and/ or assumptions about the development proposal;
- measures to promote sustainable travel;
- safety implications of development; and
- mitigation measures (where applicable) – including scope and implementation strategy.
It is important to give appropriate consideration to the cumulative impacts arising from other committed development (ie development that is consented or allocated where there is a reasonable degree of certainty will proceed within the next 3 years). At the decision-taking stage this may require the developer to carry out an assessment of the impact of those adopted Local Plan allocations which have the potential to impact on the same sections of transport network as well as other relevant local sites benefitting from as yet unimplemented planning approval.
Transport Assessments or Statements may identify the need for associated studies or may feed into other studies. However care should be taken to establish the full range of studies that will be required of development at the earliest opportunity as it is unlikely that a Transport Assessment or Statement in itself could fulfil the specific role required of a transport element of an Environmental Impact Assessment where this is required. Particular attention should be given to this issue where there are environmentally sensitive areas nearby and where the proposal could have implications for breach of statutory thresholds in relation to noise and air quality either as a result of traffic generated by the site or as a consequence of the impact of existing traffic on the site under consideration.
Paragraph: 014 Reference ID: 42-014-20140306
Revision date: 06 03 2014
What information should be included in Transport Assessments and Statements?
The scope and level of detail in a Transport Assessment or Statement will vary from site to site but the following should be considered when settling the scope of the proposed assessment:
- information about the proposed development, site layout, (particularly proposed transport access and layout across all modes of transport)
- information about neighbouring uses, amenity and character, existing functional classification of the nearby road network;
- data about existing public transport provision, including provision/ frequency of services and proposed public transport changes;
- a qualitative and quantitative description of the travel characteristics of the proposed development, including movements across all modes of transport that would result from the development and in the vicinity of the site;
- an assessment of trips from all directly relevant committed development in the area (ie development that there is a reasonable degree of certainty will proceed within the next 3 years);
- data about current traffic flows on links and at junctions (including by different modes of transport and the volume and type of vehicles) within the study area and identification of critical links and junctions on the highways network;
- an analysis of the injury accident records on the public highway in the vicinity of the site access for the most recent 3-year period, or 5-year period if the proposed site has been identified as within a high accident area;
- an assessment of the likely associated environmental impacts of transport related to the development, particularly in relation to proximity to environmentally sensitive areas (such as air quality management areas or noise sensitive areas);
- measures to improve the accessibility of the location (such as provision/enhancement of nearby footpath and cycle path linkages) where these are necessary to make the development acceptable in planning terms;
- a description of parking facilities in the area and the parking strategy of the development;
- ways of encouraging environmental sustainability by reducing the need to travel; and
- measures to mitigate the residual impacts of development (such as improvements to the public transport network, introducing walking and cycling facilities, physical improvements to existing roads.
In general, assessments should be based on normal traffic flow and usage conditions (eg non-school holiday periods, typical weather conditions) but it may be necessary to consider the implications for any regular peak traffic and usage periods (such as rush hours). Projections should use local traffic forecasts such as TEMPRO drawing where necessary on National Road Traffic Forecasts for traffic data.
The timeframe that the assessment covers should be agreed with the local planning authority in consultation with the relevant transport network operators and service providers. However, in circumstances where there will be an impact on a national transport network, this period will be set out in the relevant government policy.
Paragraph: 015 Reference ID: 42-015-20140306
Revision date: 06 03 2014
Published 6 March 2014
source: https://www.gov.uk/guidance/travel-plans-transport-assessments-and-statements
With this in mind it is crucial to prepare yourself adequately before embarking on a journey in the snow.
It is worth knowing how to prepare yourself and your car, while also considering different ways to approach your driving when faced with adverse conditions.
Is it illegal to drive with snow on your car?
The following tips can help make the journey safer.
Guide contents
Things to consider before driving in snow
How to tackle driving in the snow
Winter tyres, snow socks or snow chains?
Before driving in the snow
Plan your journey
Before you set off, plan your journey carefully. Use the RAC Route Planner to get updates on traffic news to help make your journey as smooth as possible.
Consider areas that are going to be exposed to the elements, and perhaps prone to flooding. Keep up-to-date with local weather to ensure you aren't caught out.
Leave more time
Allow for more time than you normally would before you leave to clear car windows, mirrors, lights and the top of your roof of snow before setting off, driving with snow on you car could result in you breaking the law.
You will also need to de-ice your windscreen - which can be found on our seven top tips to keep your windscreen clear in winter page.
And you will need to take time to clear the inside of your windscreen too as it is illegal to drive without full visibility through all of your windows - you can read more on our how to demist your windscreen in double-quick time page.
It’s also a good idea to carry a lock de-icer with you to clear your lock. If your locks do get frozen, try warming the key or spraying de-icer or an oil-based lubricant into the lock.
The following checks will also be time consuming so it is worth factoring them in too before you set off.
Check your wipers
Make sure any auto wiper control is switched off before turning the ignition on as this could blow the wiper control fuse if they are frozen to the screen. Your wipers need to be in good working order so you’re able to clean your windscreen effectively.
Check your tyres
Check tyres for adequate tread. Poor tyres will not grip when driving on snow and ice.
If you live in an area where snow is common it might be worth changing to winter tyres with deeper tread.
If conditions are really bad you might want to consider the use of snow socks or even snow chains.
Check you screenwash
Use a good quality screenwash that protects down to at least -35 to prevent the water from freezing. If you don’t, your windscreen wipers could be rendered useless in extreme conditions - if you are unsure, you can find out how to check and top up your screenwash here
Pack for the worst
Be prepared for every eventuality by ensuring that your car is equipped with the following: demisting pad, torch (wind-up so you don’t run out of battery), a hi-vis vest to make you visible if you break down, a blanket to keep you warm, some food, a drink, spare screenwash, de-icer, ice scraper, blanket, shovel, phone charger, map, a first aid kit, a warning triangle, some jump leads, a spade and a square of carpet that you can use to put under your drive wheels should you get stuck in the snow. Alternatively, you can buy RAC Recovery Track which will get you out of the snow as well as mud and sand.
The most important thing to take with you before driving in snow is a charged mobile phone with the phone number of your breakdown provider stored in it so you can always call for help.
How to tackle driving in the snow
- Wear comfortable and dry footwear
- Accelerate gently, use low revs and change up to a higher gear as quickly as possible
- Move off in second gear as this will help reduce wheel slip - some cars have a winter mode, which does the same job – so to check whether your car has this function in the vehicle’s handbook
- Get your speed right and maintain safe stopping distances between you and the car in front, leaving as much as 10 times the normal recommended gap
- Prepare for an uphill by leaving plenty of room in front so you can maintain a constant speed without the need for changing gear
- Use a low gear for going downhill and try to avoid braking unless necessary, make sure you leave plenty of space between you and the car in front
- When approaching a bend, brake before you actually start to turn the steering wheel. If your car does lose grip try not to panic; the key thing is to take your foot off the accelerator and make sure that your wheels are pointing in the direction you want to go in
- If you do encounter a skid, steer gently into it - for example, if the rear of the car is sliding to the right, steer to the right. Do not take your hands off the steering wheel or stamp your foot on the brakes
- When driving in heavy snow, make sure that you use your dipped headlights. Relying on daytime running lights is not enough, because they don’t always put lights on the back of your car.
- If visibility drops below a 100m, put your fog lights on. But remember to turn them off when the visibility improves.
- If the road has not been gritted, be wary of driving in the wheeltracks or other vehicles as compressed snow is likely to be more icy than fresh snow
- Controls such as the brakes, as well as the steering, accelerator and even gear changing should be operated smoothly and slowly
- Sunglasses can help to reduce the glare of low winter sun on the snow
- Keep your speed down and allow more time to stop and steer
- Finally, it’s important to think about the environment that you’re driving in, especially microclimates that might appear on the road. These are areas that perhaps the sun hasn’t got to, which could stay icy when the rest of the road has thawed. Bridges are a good example. They’re normally the first to freeze and the last to thaw. So be aware of that when you’re driving in open spaces.
REMEMBER: Make sure you keep your car clean. The salt used to de-ice roads can cause corrosion to your car over time, so it’s worth making a point of cleaning it regularly throughout the winter months.
Below we have a short and informative video outlining all things to consider when driving in the snow to complement the points above.
Read full Article @ https://www.rac.co.uk/drive/advice/winter-driving/driving-in-snow/
Source: https://www.rac.co.uk/drive/advice/winter-driving/driving-in-snow/
The clock has turned back and the days are getting shorter, with the cold getting worse by the day, be sure to wrap up warm and wear visible clothing to ensure drivers can see you when crossing roads. If your driving then do drive safely, be careful of any black ice on the roads and pedestrians. We will be out and about serving our clients delivering Traffic Surveys but equally we will be in our visibility clothing.
#Transport Assessments #Traffic Assessments #Construction Projects #Vstraffic #Modal Highways Consultants
We are a source supplier, so your work is carried out and completed by VS Traffic. Please browse through our range of services to see how we can assist your business, whether you are in engineering, planning, or design.
#Transport Assessments #Traffic Assessments #Construction Projects #Vstraffic #Modal Highways Consultants
Due to continued success and growth in north-west (Cumbria), and further afield, Modal Highways Consultants opened its Leicester-based Midlands Office in June 2018. Since that time, we have been working very closely with Modal Highways Consultants via a collaborative arrangement to deliver effective Transport Assessments that represent best overall value to our clients.
#Transport Assessments #Traffic Assessments #Construction Projects #Vstraffic #Modal Highways Consultants
We are one of less than a handful of UK survey companies with complete dedicated in-house facilities. When you instruct VS Traffic, you can rest assured all projects will be completed in-house from survey through to analysis and final reporting - guaranteeing you total quality control. Your instruction is delivered by us to your specification. It is not uncommon for some firms to engage in back-to-back contracts, and in limited cases this brings benefit to the client. However, in most cases, clients don’t intend for their survey to be passed on beyond the contracted party based on the commercial agreement as well as Health & Safety and Data Protection issues – but it is not uncommon for surveys to be sub-contracted for a second and third time. One of the main drawbacks of subcontracted jobs is that the objective can easily change from one focussed on the actual specification and therefore accuracy, to one focussed on pricing mark-ups. Not all contractors have the same priorities, whilst standards may vary considerably.
Since our inception, our focus has been on high-integrity data collection delivered by our own in-house resources. We have been firmly committed to carrying out all of our own surveys for all of our clients, and remain true to this principle.
Our success lies in accuracy and transparency
With the recent flurry in off-shore counting start-ups over the past few years, many UK firms have been jumping on to this bandwagon, transferring the counting from their firm (if any) to an offshore third party firm over which they have no control. In turn, this has spawned further growth in more start-ups, all vying for business. At face value, this appears to have benefitted UK firms by dramatically lowering counting prices, with some UK firms operating in the grey area by going as far as dictating prices. As a principle, pricing wars and accuracy/quality have a sensitive and fragile threshold – sooner or later, either quality or price has to yield. This is further compounded by the total absence of control over the counting operation.
We hold complete control over our counting operations. We have been firmly committed to carrying out all of our own counting for all of our clients from day one. Our focus is on uncompromising quality, accuracy and client service, not the maximisation of profit or the pursuit of a pricing campaign.
- Transport Assessments – A Transport Assessment or TA is a comprehensive and systematic process that sets out transport issues relating to a proposed development. It identifies what measures will be taken to deal with the anticipated transport impacts of the scheme and to improve accessibility and safety for all modes of travel, particularly for alternatives to the car such as walking, cycling and public transport.
- Transport Statement - This is a simplified Transport Assessment and is used in some cases where transport issues arising out of development proposals may not require a full Transport Assessment.
- Automatic Traffic Counts (ATCs) – An ATC machine is used to record vehicle flow and speed in one or both directions, and is useful for assessing the amount of visibility (called the Visibility Splay) required for a particular access – ATC machines can record data non-stop for as long as necessary but typically applied for 7 days
- Junctions – Junction surveys look at how vehicles pass through a junction and can be at any configuration of junction whether a T-junction, cross-roads, mini-roundabouts, normal roundabouts, etc.
- Queues – Queue surveys look at the queues of approaching vehicles whether at signalised junctions or priority-controlled (give-way) junctions – Queue Lengths are an important indicator of the efficient performance of a junction
- Saturation Flow – A measure of the maximum rate of traffic flow that can pass in a lane under free-flowing situations.
- Degree of Saturation – This is a measure of the level of use of a lane expressed as a percentage of the Saturation Flow.
- Cyclists – Surveyed on the road, footpath, crossing facilities, segregated facilities, shared paths, parks and rural areas.
- Pedestrians – In town centres, shopping centres, public transport facilities, rural paths, urban paths, events, public buildings, academic institutions, etc.
- Crossing Facilities – Pedestrian crossing facilities both controlled and uncontrolled, or informal crossing activities.
- Bus + Rail – Passenger surveys, patronage surveys, boarding and alighting surveys.
- On-Street Parking – Parking beat surveys whether to gauge parking activity by street or detailed survey of different parking facilities, restrictions and breaches – includes occupancy and duration of stay.
- Lambeth Methodology - typically used in urban settings across the country to determine the extent to which parking can be accommodated on-street - applications include residential schemes, commercial schemes, conversions and change of use. Local authorities use this information to assess the parking implications of development proposals – the information can also be used by developers to design schemes with maximum development advantage.
- Parking Compliance – Survey of the nature of parking, both compliance and breaches, whether for regulatory checks or for revenue generation.
- Car Parks – Includes parking beat surveys, occupancy, turnover, duration of stay, revenue studies, compliance and breach.
- Park + Ride – User demand, patronage study, demographics, occupancy, turnover and duration of stay.
- Vehicle Occupancy – Cordon line studies of vehicle occupancy, whether on trips to city centre, radial routes, car parks, shopping centre, etc.
- Number Plates – Useful for carrying out matching for OD and Journey Time studies, determine rat-running traffic, as well as duration of stay for parking.
- Origin-Destination – Assists in the analysis of complex junctions or networks where movements cannot be deciphered from manual observations – often achieved by collecting number plates.
- Intricate Networks – Gain an understanding of the traffic movements at intricate networks, typically achieved through micro-analysis of number plate data.
- Cordon Studies – Census counts, vehicle occupancy, bus trips, pedestrians and cyclists, etc.
- Journey Time – Gain an understanding of Journey Times between two points or multiple points - useful for network and congestion management.
- In-House Video Analysis – We carry out our own analysis and can also help you with own survey videos using our wealth of knowledge and experience.
- Independent Data Verification – Third party data checked whether numerical or video data.
- Diligence Checks – Audits of third party reports or other calculations.


