Planning applications for access to your land or property can be problematic, especially in respect of Visibility Splays or sometimes called “Sight Lines”. The speed limit of a road determines the Sight Lines. In urban settings, a 30mph road requires a sight line of 43m in either direction, whilst in a rural setting, a 60mph road requires a sight line of 215m in either direction. Sometimes those lengths are physically not achievable owing to many factors such as hedges, other people’s property, bends in the road, etc. If it can be proven that vehicles are travelling slower than the speed limit, then shorter sight lines will be acceptable. Here, it’s the 85th percentile speed that is of interest to the local highway authority. We have helped hundreds of clients secure planning permission where, through our ATC surveys, we’ve determined the speeds that vehicles are actually travelling at, which then influences the sight lines. Quite often, clients have found that vehicles are indeed travelling much slower than the speed limit, and those slower speeds have meant that clients need shorter sight lines, helping them secure permission for their access.






